Retention Systems – Scotsburn Grove, Toorak

Our latest retention Piling in Toorak.

Shotcrete walls, Capping beam and Piles all completed on time and on budget.

Retention System - Toorak

Retention Systems – Warrigal Road, Ashburton

Piles, Capping and Shotcrete walls all done on time.

450mm piles drilled into clay.

Ken did it his way!

Retention System - Warrigal Rd, Ashburton

Sporting Oval – Warrigal

Sport light pole foundation.

Piles with pile cap installation. 1200mm diameter and 6.5m deep pile.

Trowel finished concrete.

All completed with our Midi drill rig.

Sporting Oval - Warrigal

Basement – Melbourne

This basement within a building is progressing quickly.

Using our mini skidsteer and mini excavator we are able to undertake this tight access job.

Capping beam completed, piles finalised and shotcrete walls not far away.

Basement Melbourne

Basement – East Melbourne 2.0

Progressing with our basement within a building using our radio controlled low head room drill rig.

Brick walls supported, piles and capping beam completed and tight access excavation nearly done.

Luckily it wasn’t CFA piling, there is plenty of rock!

Basement - East Melbourne 2.0

Aldig Contracting Basement Process

Aldig Contracting undertake works in tight access sites. This one was in a one way street with limited access.

Enjoy our Piling, Excavation, Strip drains, Shotcrete, Steel works, Concrete Slab and modern site hut timeline.

Aldig Project Process

Basement Within A Building

A Basement within a building utilising our radio controlled drill rig.

Piles with Low Head room and very tight access. Engineered solution in East Melbourne.

Next step the capping beam.

 

Basement - East Melbourne

 

Retaining Wall – Canterbury, Melbourne

Steel and Concrete sleepers retaining wall in Canterbury.

Piles with concrete were poured on site & shotcrete in between.

Retaining Wall - Canterbury

South Yarra – Basement Solution using our CFA machine

Very Tight Basement in South Yarra sandwiched between two 6 storey apartment buildings.

Aldig provided engineering solution, CFA piles, capping beam & shotcrete walls.

Tight Access Basement - South Yarra

Tight Access CFA Basement in Carnegie

Creative engineering solution for basement.

Very tight access to create room for car stacker

Bulk excavation, shotcrete wall and capping beam all completed by Aldig Contracting, Basements.melbourne and Piling.melbourne

Melbourne most creative tight access basement contractors.

CFA Piling - Rosstown Road, Carnegie