Car Stacker – Fitzroy

The Aldig crew were hard at work completing this carstacker in a basement in Fitzroy this week.
Piles, Capping beam and Shotcrete walls all completed to a high standard.

This will be a great looking basement in when is completed!

CFA Piling – Southbank

Aldig working in the heart of our stunning city this week.

Using our CFA rig to safely drill piles in busy intersection at Southbank.

The boys are well together and with other trades to make this a productive and precise job.

They are enjoying working with such a great view!

Basement – Brighton

Aldig Contracting built another basement, this time in Brighton.

We undertook the piles, capping beam, shotcrete walls and bulk excavation for this project.

Design and construction all completed on schedule.

 

Basement - Brighton

Basement – Blackburn South

A new basement that Aldig Contracting built in Blackburn South.

In situ concrete walls were constructed on site.

More competitive than block work walls.

The project was all done on time.

Basement - Blackburn South

CFA Piling – Highett

Aldig Contracting provided a creative solution once again to building basements in Melbourne.

Solving a problem with our small drill rig, safely drilling piles 7.5 meters deep under power lines.

Ben supervised CFA piling at a site on Nepean Highway, Highett.

The site is looking tidy and ready for the next stage.

CFA Piling - Highett

Complete Package Basement – Blackburn South

Aldig Contracting are constructing a complete basement package in Blackburn South, Melbourne.

Cages were laid out ready for the piles to be installed.

Capping beams were erected ready to spray the shotcrete walls.

We undertook the piles, capping beam, shotcrete walls, bulk excavation, footings, block work walls, basement slab and suspended slab in this project.

The excavator has cleaned up the location and now the site is ready for the builder to take over.

 

Complete Package Basement - Blackburn South

Retention Systems – Scotsburn Grove, Toorak

Our latest retention Piling in Toorak.

Shotcrete walls, Capping beam and Piles all completed on time and on budget.

Retention System - Toorak

Retention Systems – Warrigal Road, Ashburton

Piles, Capping and Shotcrete walls all done on time.

450mm piles drilled into clay.

Ken did it his way!

Retention System - Warrigal Rd, Ashburton

Sporting Oval – Warrigal

Sport light pole foundation.

Piles with pile cap installation. 1200mm diameter and 6.5m deep pile.

Trowel finished concrete.

All completed with our Midi drill rig.

Sporting Oval - Warrigal

Basement – Melbourne

This basement within a building is progressing quickly.

Using our mini skidsteer and mini excavator we are able to undertake this tight access job.

Capping beam completed, piles finalised and shotcrete walls not far away.

Basement Melbourne