South Yarra – Basement Solution using our CFA machine

Very Tight Basement in South Yarra sandwiched between two 6 storey apartment buildings.

Aldig provided engineering solution, CFA piles, capping beam & shotcrete walls.

Tight Access CFA Basement in Carnegie

Creative engineering solution for basement.

Very tight access to create room for car stacker

Bulk excavation, shotcrete wall and capping beam all completed by Aldig Contracting, Basements.melbourne and Piling.melbourne

Melbourne most creative tight access basement contractors.

CFA Piling - Rosstown Road, Carnegie

CFA Piling / Tight Site

Basement behind a double storey single fronted grand terrace home in Albert Park / Middle Park with limited access for CFA Piling.

Due to start capping beam and shotcrete walls soon.

CFA Piling - Albert Park

Piling Inside an Existing Building / Limited Access in Mont Albert

Mont Albert – Piling Inside an Existing Building / Limited Headroom

Limited access to get inside

Aldig used our remote controlled Baby Piling Rig to drill 600mm diameter 7.4 meters deep piles within an existing building and created a capping beam to support an existing footing. This allows for a 10 meter high brick wall to be demolished.

Mont Albert - Limited Access

Conventional Works – Boundary Rd, Pascoe Vale

Hard Rock Drilling with a Core Barrel Auger

Boundary Rd, Pascoe Vale